Battery Simulation
Energy equalization in the DC intermediate circuit between the drive and the DC / DC converter, as a result of which the mains connection and the supply voltage are reduced to <40kW (power dissipation), disconnection with isolating transformer, insulation monitoring of the DC circuit Umax = 600V Imax = 500A Ps1 = 120kW.
Advantages in comparison to the individual connection of
drive and battery simulator to the AC mains:
- 50% less space required
- For the control cabinets only 20% of the mains connection required> small mains connection is sufficient (good for sites with a weak network)
- Lower energy costs
- Low reactive power requirements